Modern custom home at dusk with warm glass walls, cedar cladding and board-formed concrete

■  Residential  /  Commercial  /  Custom

Build it right the first time.

Planning guides, a working cost estimator and a bid request desk for custom homes, additions, remodels and commercial buildings. Scope, price and schedule get settled on paper before anyone swings a hammer.

01 / The idea

A building goes wrong long before the first wall goes up. Scope gaps, unpriced allowances, permit surprises and soil nobody tested turn a clean budget into a change order argument. We put the unglamorous questions first, so the build itself is the quiet part.

28days

Structural concrete is normally specified at its 28-day strength, so formwork and loading schedules are built around the cure.

10–20%

Contingency worth carrying on remodels and difficult sites. Opening an older building reveals wiring, framing and plumbing no drawing showed.

3bids

A workable number to compare, provided each bidder prices the same scope sheet, the same allowances and the same exclusions.

1scope

One written scope document drives the drawings, the price and the schedule. When it changes, all three change together.

Aerial view of a house foundation and early framing on a graded gravel siteSite preparation and early framing

03 / How it runs

Six stages. No skipping.

Plans and tools on a tableGreat room with large glazingClipboard on a kitchen counter during a walkthroughGloved hands holding a spirit level against a framed studTimber framing at golden hourFinished entry with oak door and stone cladding
01 / 06

Define

Scope before price. Rooms, program, performance targets and a budget ceiling go on one sheet, and everything downstream is measured against it.

  • Program and must-haves
  • Budget ceiling and contingency
  • Site and soil questions
Plans and tools on a table

Draw

Drawings that can be priced: dimensions, specified materials and allowances with real numbers, so bids compare line for line.

  • Plans, sections and elevations
  • Finish and fixture schedule
  • Structural and systems coordination
Great room with large glazing

Permit

Plan review is a schedule item. Queues, comments and resubmittals are real calendar time, so they go on the timeline on day one.

  • Application set
  • Review comments and responses
  • Inspection plan
Clipboard on a kitchen counter

Price

A bid you can read: itemized by trade, allowances named, exclusions listed and alternates priced apart from the base.

  • Same scope sheet for each bidder
  • Allowances with figures
  • Exclusions and alternates
Gloved hands holding a spirit level

Build

The visible part. Foundation, framing, dry-in, rough-in, insulation and finishes, with each stage closing on an inspection before it is covered up.

  • Hold points before covering work
  • Weekly look-ahead schedule
  • Written change orders
Timber framing at golden hour

Close out

Walkthrough, punch list, final inspections, warranties and as-built documents, handed over together instead of one at a time.

  • Punch list with dates
  • Warranties and manuals
  • Final inspection sign-off
Finished entry

04 / Numbers

Put a range on it before you call anyone.

Finish level

Average market, level site, default contingency. The full estimator adds options, site conditions, market and a trade-by-trade breakdown.

Planning range, all-in

 
Per sq ft-
Duration-

Includes contingency, design, permits and fees. Planning-grade assumptions, not a quote.

05 / Finish quality

Details decide how it ages.

Open-plan kitchen with matte dark cabinetry and a waterfall stone islandKitchen, cabinetry and stone
Timber-clad single-storey addition on a brick house at duskAddition at dusk
Oak pivot door with stone cladding and metal canopyEntry sequence
Great room with stone fireplace and mountain viewGreat room
Completed low-rise commercial building at twilightCommercial exterior
Bathroom with stone tile, frameless glass shower and walnut vanityBathroom remodel
Gloved hands checking a framed stud with a levelChecking plumb

06 / Straight answers

Questions people ask first.

The short versions are here. The long ones, with costs, permits and schedules, are in the guides.

Is the estimator a quote?
No. It produces a planning range from generic cost assumptions, your size, finish level, market and options. Only written bids against a defined scope are prices you can hold anyone to.
When should permit work start?
During design, not after it. Review queues, comments and resubmittals add calendar time, so the application set is planned alongside the drawings.
What is an allowance?
A placeholder budget for something not yet chosen, such as tile, lighting or appliances. Allowances only help if they carry realistic numbers.
How many bids should I collect?
Three is a workable number, as long as every bidder prices the same scope sheet, the same allowances and the same exclusions.
Modern custom home at dusk with warm glass walls

Next step

Ready to scope it?

Tell us what you are planning and where. Scope comes before price, and a clear brief gets you a clearer bid.

Request
a bid